Nhon Trach - Dong Nai

KTG INDUSTRIAL NHON TRACH 2
PHASE 4 (DOUBLE – STOREY)

KTG Industrial Nhon Trach 2 project is an impressive 18.69-hectare development consisting of four phases. Phase 1 and Phase 2 of the project have been successfully completed and are almost fully occupied, with all tenants having commenced operations. Nhon Trach District and its neighboring urban areas (District 2, District 9, Thu Duc District of Ho Chi Minh City and Bien Hoa City) are home of a total population size of over 2.1 million, offering a large labor pool across different skill-sets.

Key facts

Unit size

Unit size

Double Storey:
2,000 - 3,500 m²

Floor height

Floor height

0.3 m

Clear height

Clear height

Double Storey:
+Level 1: 8m
+Level 2: 7m

Electrial provision

Electrial provision

100 W/ sqm

Loading capacity

Loading capacity

2 tons/ sqm

Flooring

Reinforced concrete flooring with surface hardening agent to prevent dirt and cracks

Fire safery

Full sprinklers and fire alarm system installed

Location

Ho Chi Minh CBD

Ho Chi Minh CBD

35km (40 mins)

Tan Son Nhat Airport

Tan Son Nhat Airport

40km (50 mins)

District 2 - Ho Chi Minh

District 2 - Ho Chi Minh

27km (30 mins)

Saigon Hi-Tech Park

Saigon Hi-Tech Park

33km (35 mins)

Cat Lai Port

Cat Lai Port

29km (35 mins)

Cai Mep Thi Vai Port

Cai Mep Thi Vai Port

40km (50 mins)

Future Long Thanh Intl. Airport

Future Long Thanh Intl. Airport

25km (25 mins)





    captcha

    img

    Form sent sucessfully!

    img
    img