KTG INDUSTRIAL NHON TRACH 2
PHASE 1
KTG Industrial Nhon Trach 2 project is an impressive 18.69-hectare development consisting of four phases. Phase 1 and Phase 2 of the project have been successfully completed and are almost fully occupied, with all tenants having commenced operations. Nhon Trach District and its neighboring urban areas (District 2, District 9, Thu Duc District of Ho Chi Minh City and Bien Hoa City) are home of a total population size of over 2.1 million, offering a large labor pool across different skill-sets.
Key facts
Unit size
4,100 - 8,050 m² (Including office)
Floor height
0.3 m
Clear height
7 m
Electrial provision
100 - 200 W / m² 01 Distribution board in each unit
Floor loading
2 tons/ m²
Flooring
Powered troweled finish for factory area
Fire safery
Beam-typed smoke detector and indoor hose reels. 01 stand-by branch-off for installation of sprinklers by tenants
Location
Ho Chi Minh CBD
35km (40 mins)
Tan Son Nhat Int'l Airport
40km (50 mins)
District 2- Ho Chi Minh
27km (30 mins)
Saigon Hi-Tech Park
33km (35 mins)
Cat Lai Port
29km (35 mins)
Cai Mep- Thi Vai Port
40km (50 mins)
Future Long Thanh Int'l Airport
25km (25 mins)