TAM PHUOC B INDUSTRIAL CENTER - DONG NAI

Bien Hoa City - Dong Nai
0896896899
General
Unit size:
1.484 - 5.600 m2
(including office)
Floor Height:
0,2 m
Clear Height:
8 m
Electrical provision:
250 kVA
Floor Loading:
2 tons / m2
  • Flooring: Reinforced concrete flooring with surface hardening agent to prevent dirt and cracks
  • Fire safe: Water spay system
dji_0762-copy

 

Photo of warehouse for rent at the factory of Tam Phuoc B Industrial Park, Dong Nai of KTG Industrial

 

Situated in the Southern Economic Zone, the project’s completed technical and traffic infrastructure and its strategic location with close proximity to seaports, airports, hi-tech parks, and city centers helps manufacturers to save transportation time and costs.

dji_0763-copy-3-2

 

 

 

Extra benefits:

Situated in the Southern Economic Zone, the project’s completed technical and traffic infrastructure and its strategic location with close proximity to seaports, airports, hi-tech parks, and city centers helps manufacturers to save transportation time and costs.

Floor list
Note:
Available
Lease out
Location
Long Thanh Airport

Long Thanh airport

26km (40 minutes by car)

Tan Son Nhat Airport

Tan Son Nhat Airport

38km (65 minutes by car)

Thi Vai - Cai Mep Port

Thi Vai - Cai Mep

48km (75 minutes by car)

Bien Hoa City

Bien Hoa City

17km (35 minutes by car)

Ho Chi Minh Hi-Tech Park

High-tech Ho Chi Minh

23km (40 minutes by car)

Ho Chi Minh City
Ho Chi Minh City Center
47km (60 minutes by car)
Cat Lai Ferry
Cat Lai Ferry
47km (60 minutes by car)
Utilities
Infrastructure works such as power supply, water supply, roads, communication... in the Industrial Park are invested and built ready to serve investment projects. 
KTG Industrial
CONTACT
Hanoi Office
Lot 2-8B Hoang Mai District Industrial Park , 435 A Tam Trinh, Hoang Van Thu Ward, Hoang Mai District, Hanoi
Ho Chi Minh Office
Floor 6 - Song Da Tower, 14B Ky Dong Street, Ward 9, District 3, HCMC
View map Close